Ready for height and for winter
Up to 20 installers on one site, scissor lifts and rotating telehandlers, a permanent site manager. We have worked through a whole Norwegian winter, when lorries with material had to be pulled out of the snow.
We also work where the plant cannot stop: at night, in freezer stores and with forklifts and other machines running around us. The client shuts down only one section for the service – the rest of the warehouse keeps working.
In a −30 °C freezer store we repaired derailed and damaged racking. We bonded cracks in the floor with a special resin that cures at very low temperatures – no need to heat the hall or lay a new floor.
EN 15620: racking installation tolerances