Rails and guide tracks

Floor rails and top guide rails for stacker cranes and robots – aligned to a few millimetres, welded, ground and painted on site. Also replacement in running warehouses.

How it works

Floor rails and top guides for stacker cranes and robots. Set to millimetres, welded and ground.

Where it fits

Every warehouse with a stacker crane or a robot.

What we install

  • Floor rails and top guide rails
  • Stacker crane structures (incl. Atlas 2D)
  • Rail replacement and re-alignment in running warehouses
  • Welding, grinding and painting on site

Our project

Replacing robot rails in a running warehouse

Porsche, Leipzig · 2025 · for Polypal Deutschland

Four people, 560 metres of rail, six weekends from Friday evening to Sunday. A tolerance of a few millimetres – and every Sunday evening production started on time.

Mobile tower in a narrow aisle, Porsche Leipzig
Weld on a running rail after replacement

Where else we have installed it

Kris De Leeneer, Lokeren (Belgium, Atlas 2D) · Clarebout Potatoes (Belgium, the first Atlas 2D installation in the world) · Rail replacement at several companies

Got a project? Send the drawings – we’ll prepare a quote.

Projects of 20,000 to 60,000 man-hours are everyday work for us. Attach drawings, a bill of materials or installation instructions.

Rafał Paweł Taras, CEO of WDW Nordics
Rafał Paweł Taras
CEO, WDW Nordics