For Stow Austria we built six mobile racking systems with 8,544 pallet locations. First, in a week and a half, we installed 810 metres of rail that were then cast into the floor. Then, in four weeks, we assembled the racking and the mobile bases and set them on the rails. Finally we connected the drives and controls ourselves. The system worked from day one.